1 Main St, Toronto — Site Drainage Review

Project #: 20418  ·  Inspection date: 14 Feb 2026  ·  Reviewer: P.Eng
OBS 01 — OVERHEAD DOOR

Standing water at the overhead-door threshold indicates a drainage issue at the loading entrance. Slab slopes back toward the building.

OBS 02 / 03 — GATE & SLAB

Gate is 15 ft wide and seals well. Recommend a trench drain across the opening and slab reinforcement for heavy forklift traffic.

OBS 04 — TRENCH DRAIN

Trench drain discharges to the right of the entrance; pipe runs under the slab, 20 ft from the parking area. No ice issue observed at the parking-lot drain.