From videos, images, and voice notes to a report in minutes

Watch a site visit become a finished, client-ready report — captured on your phone, written by Tenera, delivered in four steps.

0:00
PHOTOVIDEOSLO-MO

Record videos and images like you normally would

Your phone's camera

A quick video walkthrough and a few photos — shot in your normal camera app.

Narrate what matters

Call out the important details out loud. Tenera records your narration and understands your observations.

Upload to Tenera

Share it quickly and easily without installing an app.

Reports / New Inspection
ST

Evidence

3 items · 1 video · 1 photo · 1 voice note
ST From you · 3 items
site_walkthrough.mp40:5110:38
Tenera · 51-sec walkthrough of Level B2 — crack and moisture at spot 117.
front_elevation.jpg10:39
Tenera · Two-storey brick façade; efflorescence near grade.
voice_note_01.m4a0:1210:41
Tenera · “Diagonal crack ~1.2 m along the mortar joint, Level 3.”

Almost ready

0 of 3 items read
0 video
0 photo
0 voice note
Building Envelope Review
Structured to your template
FileHomeInsertLayoutReferencesReviewView
Undo
Calibri 11
B I U S A
Font
12
Paragraph
NormalHeading 1Heading 2
Styles

Smith Warehouse — Completion Report

Project: Smith Warehouse – Cafeteria, Reception & Basement Level
Work dates: 14–15 Feb 2026  ·  Project #: 20329
Report date: 17 Feb 2026  ·  Prepared by: Tenera
SITE WALKTHROUGH
VIDEO0:51
Level B2 · 14 Feb 2026 · 0:51
INTRO

Concrete restoration and epoxy flooring repairs were completed across 175 sq. ft. of cafeteria and reception. Deteriorated concrete was removed to 3 in. depth, primed with a water-based epoxy system, and restored with a polymer-modified cement mortar before the finish coat was applied.

SITE PHOTOS
Fig. 1 — Crack extent, ceiling above spot 117
Fig. 2 — Active water infiltration
1. CONCRETE CONDITION

Significant deterioration was identified across the cafeteria and reception floors, including spalling, surface cracking, and delamination. All unsound material was mechanically removed using a chipping gun to expose a clean, stable substrate. Removal depth reached 3 inches in the most affected areas.

IMPACT ON SCOPE

Original scope called for 70 sq. ft. of cafeteria treatment. Field assessment confirmed deterioration extended to 160 sq. ft., requiring a scope revision. The expanded area was documented and approved by the site supervisor prior to works commencing. Total treated area across both locations: 175 sq. ft.

Tenera is writing your draft…
Tap a tool to watch it edit
Or type your own…
reports.tenera.ai/r/123-front-st
or export: Word PDF
NP
North Point — Client
Active now
Here's your completed report 👇
Building Envelope Review — 123 Front St
reports.tenera.ai
Delivered
Message…
reports.tenera.ai/r/123-front-st

Opening report…

reports.tenera.ai/r/123-front-st
Live
Tenera Reports
PUBLISHED · 2026-07-03
Building Envelope Condition Review — 123 Front Street
Anyone with the link can view — no sign-in

Site Walkthrough

0:51

Level B2 walkthrough — crack and moisture observed near spot 117.

Document Metadata

Site / Address123 Front Street, Toronto
Inspection Date2026-07-03
Report Date2026-07-03
Inspector / ReviewerS. Tremblay, P.Eng.

Observations

A diagonal crack approximately 1.2 m in length was observed along the mortar joint at Level 3 of the north elevation. Moisture testing at spot 117 returned 28%, consistent with water ingress, and has been flagged for follow-up.

Fig. 1 — Diagonal crack observed at Level 3, north elevation.

Recommendations

Repoint and seal the affected joint at Level 3, and re-test moisture at spot 117 within 90 days. If the reading remains elevated, investigate the wall assembly for a concealed water path before further finish work proceeds.